Analysis & Test: Difference between revisions
From Engineered Residual Stress Implementation (ERSI)
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
Welcome to the ERSI Analysis & Test committee website. A list of the current and previous round robin activities are listed below, which will link to the corresponding site with all the associated files available for download. | Welcome to the ERSI Analysis & Test committee website. A list of the current and previous round robin activities are listed below, which will link to the corresponding site with all the associated files available for download. | ||
* [[2023 Boeing IRAD Testing]] | * [[2023 Boeing IRAD Testing|'''2023 Boeing IRAD Testing''']] | ||
* '''[[2023 Validation of Fatigue Crack Growth Modeling Solutions using Measurements Collected on API X65 Piping Specimens]]''' | * '''[[2023 Validation of Fatigue Crack Growth Modeling Solutions using Measurements Collected on API X65 Piping Specimens]]''' | ||
* '''[[2022 Interference Fit Fastener Round Robin]] ''(in-work)''''' | * '''[[2022 Interference Fit Fastener Round Robin]] ''(in-work)''''' | ||
Revision as of 13:39, 12 September 2024
Welcome to the ERSI Analysis & Test committee website. A list of the current and previous round robin activities are listed below, which will link to the corresponding site with all the associated files available for download.
- 2023 Boeing IRAD Testing
- 2023 Validation of Fatigue Crack Growth Modeling Solutions using Measurements Collected on API X65 Piping Specimens
- 2022 Interference Fit Fastener Round Robin (in-work)
- 2022 Walker/Newman IRAD (in-work)
- 2022 Cx Variability Round Robin
- 2022 Boeing Spectrum Challenge
- 2021 Stress Intensity Factor Round Robin
- 2021 AFGROW Workshop Round Robin
- 2019 DST Assist Wide Plate Spectrum Challenge
- 2019 Interference Fit Fastener Round Robin
- 2017 Cx Round Robin
- 2017 AFGROW Workshop Round Robin
- Sub-groups